Laserfiche WebLink
.' ~.., <br /> <br />Sunflower Energy Bond Calculation <br />Page -2- <br />1 truck, 1 loader 2 days <br />290/day 300/day <br />C) Revegetation <br />155/acre <br />$3,100 <br />U <br />D) Building Removal $2,000 <br />office/bath 14,500 ft3 X $.10/ft3 = $1,450.00 <br />house <br />F.an <br />Substation $ 550.00 <br />Daily <br />Total Bond $35>767.50 <br />Cost Equipment 6 Operations <br />Catepillar <br />$690. D-8 Dozer <br />1) push material downslope to loader <br />2) rough grade fill <br />3) pull sheepsfoot <br />4) final grade bench and access road <br />$300. Loader 2yd. Caterpillar <br />1 fill trucks 6-10 minute fill time <br />$290. Truck 20yd Mack <br />1 haul fill to bench b access road 10 minute haul <br />$335• Grader <br />1 final grading of reclaimed surface (not portal or) <br />(access road ) <br />$130. Sheepsfoot 59" sheepsfoot <br />1) compact fill <br />Assum PC~on s <br />1) assume D-8 can operate up vertically E <br />down spoil slope. <br />2) assume compaction can occur concurrently <br />with rough grading operations of D-8. <br />3) assume 800 yds/day limit. <br />