Laserfiche WebLink
~- <br />'. ~. <br />V. $CatUS •7F P-ob!e,a Pesolution <br />The `o!lowi na ite:s crncern orcblems identified at ere~riocs _,.snections. Proble.a are classi- <br />fied into taro catecories. These are: i1) orobl_s reso h•el; ar,d (2) opes'ator de/incuen t. <br />T.he date that the problem is reso!ced or tee Gate that the ocerator is deemed delinouenC is <br />to be clearly stated. <br />RESOLUTION IN PROGRESS <br />81-4. Install buffer zone mar}:ers after ncrm.it issuance. <br />81-5. Install perimeter marker after permit issuance. <br />81-8. Continue to reclaim the overburden pile and adjacont surface mine area. <br />PROBLiiil RF,SOLVED <br />82-4. Regrade the base rf the surface mine at'ea in selected areas to ensure positive drain.i~ <br />to the sediment pond by September 15, 182. <br />NOTE: Rr_grading was done in selected areas, and a small drainage ditch was constructc <br />ffnc:~err. r, dater was noted to be~ponding in one area - see Problem EZ-5 on <br />previous page. <br /> <br />7 <br />