Laserfiche WebLink
u <br />• not be in contact with the operational area due to the culvert. <br />' S. It was agreed that this question could be dropped. <br />~ 6. A letter is forthcoming from the surface owner of <br />the area used for the rail loadout stating that SEI is to <br />comply with the terms of the lease which is included in the <br />i <br />~ application as Exhibit C-VIII of Appendix E. <br />7. Page 2-37 has been rewritten to address the disposal <br />I <br />! of "coal-like material." The post-mining topography will be <br />exactly the same as the site now exhibits. <br />8. All costs associated with the reclamation of the loadout <br />have been included in the rewritten Figure 3.7-1. <br /> <br /> <br /> <br /> <br />-1.4- <br />