Laserfiche WebLink
STATE OF COLORADO 91r:nnRn n. IMAM. nm r.mn~ III III III III IIII III <br />.999 <br />DEPARTMENT OF NATURAL RESOURCES <br />D Monde Pasco o, Executive Director <br />N11NED LANE) REI:LAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 839-3567 <br />David C. Shelton <br />Director <br />April 19,~Z981 <br />Mr. Dennis Conn <br />GEX Colorado, Inc. <br />P.O. Box W <br />Palisade, Colorado 81526 <br />RE: Cameo Diversion Ditch <br />Our file pC-041-81 <br />Dear Dennis, <br />Pursuant to our telephone conversation of April 10, 1981, the Division <br />is hereby extending the compliance deadline for applying erosion control to <br />the South end of the Cameo Diversion Ditch from April 13, 1981 to May 18, <br />1981. The compliance date is being extended because the present plan to <br />install a flume is a better long-term solution than the former plan of <br />rip-rapping. <br />I very much appreciate your cooperation in calling me on this problem <br />before the compliance date had passed. If any future compliance dates be- <br />come difficult to meet, the Division is quite willing to work out a solution. <br />Sincerely, <br /> <br />Jim Herron, <br />Reclamation Specialist <br />JH/cg <br />