Laserfiche WebLink
~~ i <br />RIDER TO MINING PERMIT <br />Permit Date: July 31, 1993 <br />Permit No. C-92-080 <br />i <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. 1 <br />8Y AUGUST 27, 1993, OAKRIDGE ENERGY WILL SUBMIT CROSS SECTIONS OF EACH <br />OF THE DRAINAGE DITCHES AND CROSS SECTIONS AND A PROFILE OF THE <br />PERMANENT DIVERSION OF CARBON JUNCTION CREEK. <br />Stipulation No. 2 <br />BY AUGUST 27, 1993, OAKRIDGE ENERGY WILL SUBMIT UPDATED WORST-CASE, <br />WORST-CASE RECLAMATION, AND FINAL RECLAMATION MAPS, ALL WITH <br />APPROPRIATE CROSS SECTIONS, TO REFLECT 4.75H:1V FINAL SLOPE GRADIENTS. <br />Stipulation No. <br />BY AUGUST 27, 1993, OAKRIDGE ENERGY WILL RESOLVE ITS APPLICANT/VIOLATOR <br />SYSTEM ISSUES WITH THE U.S. OFFICE OF SURFACE MINING. <br />Stipulation No. 4 <br />BY AUGU57 27, 1993, OAKRIDGE ENERGY WILL APPLY TO THE AIR POLLUTION <br />CONTROL DIVISION OF THE COLORADO DEPARTMENT OF HEALTH fOR A CHANGE IN <br />OPERATOR NAME TO THE EXISTING AIR EMISSIONS PERMIT(S), FROM PUEBLO <br />COAL, INC., TO OAKRIDGE ENERGY, INC. <br />Stipulation No. 5 <br />BY AUGUST 27, 1993, OAKRIDGE ENERGY WILL SUBMIT COPIES OF ITS MSHA <br />PERMIT AND COUNTY SEWAGE DISPOSAL PERMIT. <br />ACCEPTED AND AGREED: <br />By <br />Operator Title <br />DIVISION OF MINERALS AND GEOLOGY <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />i ~~~ ~~ <br />Division Director ~r <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />4361G <br />