Laserfiche WebLink
- - III IIIIIIIIIIIIIIII ~~1~ <br />~p Cod DEPARTMENT OF NATURAL RESOURCES <br />'~~ ~OR9 <br />fQ O David H. Getches, Executive Director <br />*'~~'; ~ MINED LAND RECLAMATION DIVISION <br />* " ,,,L~ • DAVID C. SHELTON, Director <br />Ric ha~tl D GLamm '.Y±%.;!y~ <br />Governor <br />TU: Pryor Strip File IVo. C-U31-81 <br />FR UM: Susan Mowry ~ <br />RE: Stipulation No. 2 <br />DATE: September 22, 1983 <br />Un August 2[ & 23, 1933 i visited the site of the Pryor mine. J.F. Sato <br />and Associates were also on site gathering baseline data for permit <br />stipulation satisfaction. We discussed soil sampling on site and decided <br />the following proyram would be the must beneficial: <br />- soil Ylorizon depth information would be gathered in the Mazano <br />loam, and in the Louviers-Travessilla Complex both on the ridge <br />top and on the lower lying areas. <br />- soil samples would be collected and analyzed in the Mazano <br />loarz~ and Louviers-Travessilla Complex on the ridge top only. <br />Existing soil samples for the Louviers-Travessilla Complex on <br />the low lying areas should be adequate. <br />/th <br />Doc. No. 5725 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />