Laserfiche WebLink
. i~ Comments ~ • <br />Page 2 <br />Pond C <br />1. Since maps indicate that I`ond C i ; prol>osc`•1 to be constructed, the <br />Division may be concerned with groundwater inflows to thn pond and possible <br />impacts and reclamation prohlems~pending the Ifvl' investigation. <br />~ 2. Wi1I the operator be required to disturb +oithi.n the stream buffer <br />zone during construction? <br />Ditch F-1, F-2, and F-1 <br />1. The operator will div!rt dn,inage from Pfidrllc Creek watershed by <br />way of ditch F-3. will ditch F'-J discharge into the existing diversion ditch <br />on contour 6770? If so, this i.`ater will flow into tho wrist ing stock pond .,hove <br />ditch F-2. Wi11 this additional water pas r. any stability concerns to thn niav~-- <br />stock pond? (Jill water riyhts be needed Cor this additional water bei.nq div~~,r.~~d:' <br />2. The applicant needs to clarify how peak fJot.`s wire computed for <br />ditch F-2. It does not appear that this rJitch +.•as si~erl (or the r.>>tershod area <br />contributing to the existing sCOCk pond. Please clarifu and justify the calcu- <br />lations. - <br />3. The applicant should consider ch,vnlin~J the, lor_otion of the outlet n( <br />ditch F-2 since iL is outside the permit area. (Jill. this ditch r_rass a road be Lore <br />dischazginy into Fish Creek? !/i .11 a culvert be provi dcd? <br />Pond G <br />1. Exhibit 3 in VoLrnx~ G gives design, (or Pend r;, l: Pund the. <br />existing stock pond above ditch F-Z? Is this pond m7nter] to thy` propos~yl <br />mining operations? Poes Bnergr/ Fuels want this %(ocY, po~,~l reviewr.rl for compliance <br />with our regulations? <br />Ditch /1-1, and 112 <br />I. The applicant rtecrl.^ Co del inen to the w.i1.•~r •.h•~rl ., rca c~ontri lnrt in~l <br />to ditch 1l-1. The applicant inrlic:a terl a drnina<7~' •tr"a n( R. P~ or: rr•; which duns <br />not compare with Pfap 11 ,, ll. i important f~hat wr,~ hnv~~ nn acr:urnte estimatr~ of <br />the water being collected in this ditch since .it (ecrls to the detention basin <br />(pit). <br />2. It is unclear from hfnp~l!R ns to huw wa(~~r lrum ditch if-1 and I1-2 <br />reaches the detention basin (pit). I`iense cl;rrify. <br />3. 'I'h~~ cgni vn.l r•n r_ nail pc;Jc rrrlcular.~•~! r~u •li(r~h I1-7 a•.i~: Inu• h~l .+ <br />factor oC ( cfs. Sines Urc r^sul Lint /,raY, wn~t ul( Icy 1 r:(; ~~nd !na•hn., rl i'c <br />high, no correction will be reguicr_d. <br />