Laserfiche WebLink
Mr. Joe Carpio - 5 - May 11, 1987 <br />8. Based on the potential fora water table to occur within four feet of the <br />bottom of the leach field proposed for the Hay Gulch area, a piezometer <br />needs to be installed down gradient of this leach field. This small <br />diameter well should be deep enough to at least partially penetrate the <br />water tab]e (minimum 10 feet in depth) and should be completed in such a <br />manner to minimize surface effects. <br />La Plata Coal needs to submit the following information regarding this <br />well. <br />a. An updated map showing the proposed leach field and piezometer <br />location; <br />b. A diagram depicting the proposed well completion material and <br />methods; <br />c. A proposed method of determining aquifer transmissivity in the <br />vicinity of the well; and <br />d. A proposed monitoring plan which should include a schedule for <br />measuring depth-to-water and for water quality sampling. <br />Also, the appropriate portions of the text will need to be revised to <br />reflect current mine-site status. <br />9, La Plata Coal needs to ensure that the same soil nomenclature for the <br />text, corresponding exhibits, and corresponding maps is employed. The <br />text, Pages 2.04-26 to -27, and Map 4 utilize the same nomenclature <br />(i.e.: soil associations); however, the referenced Exhibits 5 and 71 <br />utilize soil map units. La Plata Coal needs to modify the application to <br />insure consistency throughout the document. <br />A lication Section 2.05 (Rules 2.05.3 - 0 eration Plan; 2,05.4 - <br />Rec amation Plan; and 2.05.5 - Post-Mining Land Use <br />10. While reviewing the new text and new maps, the Division has identified <br />the following instances where items are referenced in the text but not <br />portrayed on the corresponding maps. La Plata Coal needs to update the <br />maps to reflect the following referenced information. <br />a. Page 2.05-6 states the mine fan is shown on Map 11. <br />b. Page 2.05-10 states the electrical substation is shown on <br />Map 11. <br />c. Page 2.05-12 states the method of planned pillar extraction <br />is shown on Map 10. <br />d. Page 2.05-16 states the water well is shown on Map 7. <br />e. Page 2.05-17 states the coal handling structures (e. g.: <br />overland conveyor) are shown on Map 11. <br />