Laserfiche WebLink
Reclamation Cost Summary Cont'd <br />AFB <br />Sheet ~f- of S Sheets <br />TASK ITEMS Cost (S) <br />C. Drill Hole/Monitoring Well Seals <br />Task Description <br />~~~ f~ ~~,~ fto~ ~cr_c.~ N 4 <br />Tuslr'-/ 2 <br />D. Structural Demolition (total from worksheet) ~ y 6 $ <br />tt~~ss >~ <br />E. /Reve etation (total from worksheet) ~ I ~2.-`~~ <br />F. Fencin (total from worksheet) ~! <br />~os/r~/~f <br />G, ob./Demob. (total from worksheet) $ z 3 S (. ~ ~ <br />Total Direct Reclamation Costs <br />(Items A through G ) S ~~~~~~ SO <br />II. INDIRECT COSTS <br />A. Overhead Expenses <br />1. Public Liability Insurance - 0.82% of <br />direct cost ~' 3G7, ~{ 7 <br />2. N ,4 <br />3. Contractor's performance bond - 0.8'< of <br />direct cast ~C •00 <br />4, Job Superintendant E L8.o! /hr x total <br />~ob hours i91. ~ ~ gl0• ~ 2 <br />B. Contractor's Profit - 10% of direct cost Y' ~g 7 `t g <br />Total Overhead and Profit (Items A 8 6) E I D, O Z S-! 7 <br />Contract Cost = Total direct cost S 44~$)4.8J <br />Total 0 8 P + 5 10~o25_I'~ <br />= S 5~, 8`[9.9 ~ <br />c. <br />Engineering Costs <br />1. Engineering 8 bid document prep-fees - <br />4.254 of contract 2 3 3 3. 2 <br />2. Engineeringg services contract issuance y6~ <br />cost - 1.75b of contract ~ S <br />Total Engineering Costs S ~,_Z4~f- ~ O <br />