My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12469
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:54 PM
Creation date
11/19/2007 2:31:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Application Correspondence
Doc Date
1/10/1983
Doc Name
Letter for Findings on Stips 1 and 2
From
Blue Ribbon Coal Company
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
blu¢ <br />~b~b~on <br />company <br />January 10, 1983 <br />Mr. Robert Little <br />Colorado Mined Land Reclamation <br />Department <br />Department of Natural Resources <br />1313 Sherman Street <br />Denver, CO 80203 <br />Re: Blue Ribbon Mine Permit No. C-047-81 <br />Gentlemen: <br />blue ribbon coal company <br />p, o. box 58 <br />delta, Colorado 81416 <br />(3031874-7561 <br />RECEIVED <br />JAN 101983 <br />MINED LAND RECLAMATION <br />COLO. DEPT. OF NATURAL RESOURCES <br />Blue Ribbon Coal Company is required to submit information <br />pertaining to stipulations No. 1 and No. 2 by requirement of the <br />CMLRD findings document. <br />Stipulation No. 1 requires field work and mapping related to <br />the colluvial material along the haulroad cut. Rocky Mountain <br />Geotechnical was contracted to do this work. Their report includ- <br />ing maps is being submitted directly to your office no later than <br />January 10, 1983. <br />Stipulation No. 2 requires the protection of riparian vegetation <br />adjacent to pond No. 1. The Blue Ribbon Coal Company will leave this <br />habitat intact including related vegetation adjacent to pond No. 1 and <br />the trees adjacent to this pond if this area is not needed for a <br />buttress to ensure slope stability of the final slope backfill <br />configuration. This final configuration will be determined and <br />accompany the stipulation No. 3 response which is required 60 days <br />after permit issuance. <br />If you have questions, don't hesitate to call. <br />Very truly yours, <br />~C1iy~U-- C,LGL.~' -yYv <br />Marvin E. Adam <br />Chief Engineer - Delta Operations <br />MEA: pas <br />cc: W. S. Tate <br />T. J. Mitchell <br />
The URL can be used to link to this page
Your browser does not support the video tag.