Laserfiche WebLink
Mr. Jim Stover • <br />November 20, 1996 - Adq. Rev./Bowie No. 2 <br />Page 3 <br />iv) Response accepted. Please attempt to rehabilitate Wells 13 and 38. <br />v) Response accepted. Have the wells been installed? If not, provide a specific well installation <br />schedule. <br />vi) Response accepted. A stipulation will be attached to any future approval which specifies that <br />additional hydrologic baseline monitoring and hydrologic analysis will be required if B-Seam <br />mining is proposed by BRL. <br />vii) Response accepted. <br />viii) Response accepted. Monitoring of the zone above the B-Seam may be required with any <br />proposal to mine B-Seam Coal. <br />ix) Response accepted. <br />x) Response accepted. <br />xi) Response accepted. <br />xii) Please address the possibility that these wells might be rehabilitated. <br />xiii) Response accepted. <br />xiv) Response accepted. <br />xv) Please provide additional Steven Draw data to complete the 1996 flow season. <br />xvi) Response accepted. <br />zvii) Response accepted. <br />xviii) Please provide the requested baseline data for the North Fork of the Gumuson River. <br />Downstream Flow measurements may be required in the future, if mine site discharges occur. <br />14) Response accepted. <br />14a) Is there any possibility that any of the irrigation ditches listed in the permit application could <br />be affected by subsidence impacts? Please provide a brief discussion regarding the potential, <br />or the lack thereof, for such impacts. <br />15) Response accepted. <br />17) Response accepted. <br />