Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />SUNDANCE COAL COMPANY <br />May 5, 1986 <br />Mr. Gregg Squire, Reclam. Specialist <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Gregg: <br />~'~'~EII/E® <br />MAY g 1~ <br />_~ ..::u ~~cw~aana <br />,. 176j:i. ~f Nataral Re~~e <br />Enclosed herewith is a map of the disturbed area and <br />an explanation of the computation for figuring the amount <br />of additional topsoil required to reclaim the Sundance mine <br />and facilities area including the spoil pile. The <br />additional topsoil would be supplied by a local contractor <br />(see attached bid) at $3.75 per yard, tested and delivered. <br />Total cost would be $30,585.75. <br />Sincerely, <br />HTU:rb <br />Enclosure <br />Howard T. Urband <br />p.o. box 751 ~ trinidad, Colorado 81082 ~ 13031 846-9251 <br />