Laserfiche WebLink
Stipulation No. <br />PRIOR TO CONSTRUCTION OF ANY TRANSMISSION FACILITIES WITH THE PROPOSED <br />PERMIT AREA, THE PERMITTEE MUST SUBMIT DESIGNS FOR TRANSMISSIONS <br />FACILITIES TO THE DIVISION FOR APPROVAL PRIOR TO CONSTRUCTION. THESE <br />DESIGNS MUST MINIMIZE POTENTIAL FOR RAPTOR ELECTROCUTION. <br />ADDITIONALLY, THE PERMITTEE SHALL SUBMIT WITHIN 60 DAYS OF PERMIT <br />ISSUANCE, DESIGNS FOR ANY EXISTING TRANSMISSION LINES WITHIN THE <br />PROPOSED PERMIT AREA. <br />Pursuant to the finding required by Rule 2.07.6 (2) (n), and on the basis of <br />available information, the Division finds the proposed operation will not <br />affect the continued existence of endangered or threatened species or result <br />in the destruction or adverse modification of their critical habitat. <br />With the acceptance of the above stipulations, the proposed operation in <br />compliance with the requirements of this section. <br />