Laserfiche WebLink
<br />C. evaluation of Compliance <br />815.21 Topsoil: General Compliance <br />(a) Segregation and conservation before <br />area disturbance. <br />Applicant is in compliance. (v2,~p.e16-6) <br /> <br />(b) Redistribution or storage. <br />As shown on the Topsoil P.emoval, Storage <br />Redistribution and~Revegetation Maps, ("tap <br />41, Map 42) all topsoil cai11 be immediately <br />redistributed as required under 30 CrP. 816.24 <br />or placed into sterage pending redistribution <br />as required under 30 CFP. 816.23 (v2 pp .816-6) <br />Applicant is in compliance. <br />816.22 Topsoil: Removal <br />(a) Timing <br />[.Till compl:a , (v2,pp.816-7) <br />(b) Materials to be removed. <br />The subhorizons of several soil series <br />will be removed with the A horizon. <br />Subsoils of these so'_1 series are <br />suitable as plant growth media and will <br />act as supplemental material to topsoil. <br />[~?i11 comply. (v2,pp.816-7) <br />(c) Thin subsoil conditions <br />Applicant complies with this section. <br />(d) Subsoil segregation <br />Applicant comp lies.(v2,pp,816-10 to 816-11) <br />(e) Topsoil substitutes and supplemenCs <br />Applicant complies with this section. <br />(v2,pp.316-12 to 816-14) <br />