Laserfiche WebLink
<br /> <br />Attachment <br />Stipulations <br />Attached to Office of Surface Mining Approval <br />of Minor Modification to Coal Mining and Reclamation Plan <br />for United States Steel Corporation's Somerset Mine <br />(Sunflower Energy Corporation-Operator) <br />Federal Coal Lease C-033301 (E-Seam) <br />1. Under [his approval, Sunflower Energy Corporation shall undertake no <br />additional surface disturbance associated with the Blue Rihbon Mine (except <br />Eor mitigation of identified cultural resources, implementation of Che <br />subsidence monitoring network, and necessary hydrologic monitoring). <br />2. Under this approval, Sunflower Energy Corporation shall no[ increase the <br />monthly rate of coal production above the highest monthly production rate <br />achieved in 1980 at the Blue Ribbon Mine. <br />3. If cultural materials are located during Che survey to he conducted by [he <br />Office of Surface Mining (OSM), Chey will be recorded by OSM and documentation <br />will be turned over to Sunflower Energy Corporation (SEC). Upon receiving the <br />completed forms, SEC will, within 50 days, in conjunction with OS M, the I1,$. <br />Forest Service, and State Historic Preservation Officer (SHPO), evaluate and <br />prepare National Register forms for the determination of National Register <br />eligibility. Additionally, regarding sites threatened by potential <br />subsidence, it is the responsibility of SEC to formulate, within 90 days of <br />receiving the OSPt survey form, a mitigation plan acceptable to the above <br />agencies and Che Advisory Council on Historic Preservation. Preservation <br />and/or mitigation of impacted cultural resources is the responsibility of SF,C. <br />4. If, during mining operations, previously unidentified cultural resources <br />should be discovered, Sunflower Energy Corporation (SEC) shall insure Chat the <br />site is not disturbed and shall immediately cease land disturbing activities <br />within the vicinity of the site and notify the Regulatory Authorities. SEC <br />shall ensure [ha[ the resource(s) is properly evaluated in terms of [he <br />National Register (3h CFR 60.6). Should a resource be determined eligible for <br />listing in the National Repis[er of Historic Places in consultation with the <br />Regulatory Authorities and the SHPO, SEC shall consult with and obtain the <br />aPProv al of the Regulatory Authorities and the SHPO concerning the development <br />and implementation of mitigation measures as appropriate. Activities shall <br />not resume until these measures have been completed and approved. <br />5. Within 45 days of written acceptance of [his approval by Sunflower Energy <br />Corporation (SEC), SEC shall submit to the Regulatory Authorities for approval <br />a detailed subsidence monitoring plan to detect effects to the surface which <br />may result from subsidence. Prior to implementation of the approved <br />monitoring system, SEC shall not engage in the removal of pillars in Section <br />35, T. 12 S., R. 91 W. In addition, within 45 days of written acceptance of <br />this approval, SEC shall submit to the Regulatory Authorities a detailed <br />analysis of [he extent and anticipated effects of subsidence, a description of <br />