My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12291
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:39 PM
Creation date
11/19/2007 2:28:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Application Correspondence
Doc Date
1/8/1981
Doc Name
RESPONSE TO ADEQUACY COMMENTS IN LETTER OF 12/8/80
From
MINERAL RESOURCES AND ENGINEERING INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. MICHAEL, SAVAGE <br />Page 5 <br />January 7, 1981 <br />best to stipulate final design on this until the permanent <br />program sulinission. If you want you can check the design based <br />on the fact that two five foot culverts are in place. <br />The remainder of Bob's concerns have been included <br />• in Dariy's letter to Jim Kent. <br />Additional Information <br />1) Copy of proofs of publication and adjacent landowner notification <br />are enclosed. Note, the signed return receipts will be forwarded to you <br />upon our receipt of the same. <br />2) loadout. <br />a) A copy of the agreeiresZt letters between Trinidad <br />Basin Mining, Inc. and the Atchison, Zbpeka and Santa Fe <br />Railway Company for use of the railroad siding as a coal <br />loadout. <br />b) A copy of the publication notice and the land- <br />cxmer notification. It should be noted that the loadout <br />is contained within the boundaries of the AT&SF Railway <br />Company. <br />c) The operation plan for the loadout facility is <br />rather basic. Coal is hauled in from the mine by semi- <br />tractor trailer trucks and dumped into the crusher. N(7TE: <br />Coal may be stockpiled at the loadout prior to and after <br />crushing depending on equipment availability and trans- <br />portation requirements. The croal is then crushed to the <br />various sizes required by the users and stockpiled. The <br />stockpiled coal is then loaded into the awaiting railroad <br />cars for transport to the respective markets. The coal <br />will be sprayed with a chemical dust suppression product <br />to control dust. <br />The area has historically been used as a coal <br />loadout facility prior to TRM's obtaining the lease and as <br />such no topsoil was available for salvaging. In fact, a <br />drill hole indicated that the area had been previously used <br />at least four times as a coal loadout. This was readily <br />seen in the overburden profile. <br />The sediment control system will be ccmg~rised of <br />two sediment ponds and collection ditches leading into the <br />ponds. The designs of the ponds and ditches are as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.