Laserfiche WebLink
<br /> <br />OC No. 2 Reclamation Plan Bid File -2- August 31, 1995 <br />Question No. 6 - "Will you be able to... meet time frames...?" <br />- No problem as long as P.O. in place by 9/11 (or within a day or two). <br />Otherwise, "it could ge[ dicey." <br />- Balaz asked if they can start work upon notification and let paper follow. <br />told him I'm not sure. <br />- Shepazd can scramble with 24 hours of notice. <br />Question No. 7 - "Will you be able to visit the site?" <br />- No problem. <br />- Balaz already knows the site. <br />- Two hours, 45 minutes travel. <br />Question No. 8 - "Do you have necessary equipment...?" <br />-Total station <br />- CAD <br />- Access [o staff engineers and hydrologists (KLH). <br />- Access to geotechnical engineer (KLH) if needed. <br />- Will use physical data to do geotech work. <br />- Balaz states he can do all work without much need to draw on others, but it is <br />available if needed. <br />Capping Statements <br />- Very interested <br />- They state they can offer much, and keep on budget. <br />- Much available technology, so very cost effective. <br />DAB/bjw <br />\B1W\OC#2.DAB <br />