Laserfiche WebLink
~ v <br /> The appllc <br />must by the regulatory <br />submit for appro <br /> L authority a schedul e for topsoil stripping showing the <br />vl -~ amount of topsoil to be removed ahead of mining. (Also see <br /> ~ <br />`~ stipulations in the Backfilling and Grading and Bonding <br /> ~ <br />C <br /> sections of Chapter I II of this TEA). <br />~. <br />Wyoming Fuels proposes to replace topsoil and seed in the <br />late Fall (page 58, Vol. 1 of the permit application). This <br />allows for maximization of moisture in the spring of the follow- <br />ing year. <br />Wyoming fuels proposes to perform "soil testing for fertili- <br />zation" for topsoil to be replaced on disturbed areas (pages 4 <br />and 5, Addendum II). However, a detailed description of the soil <br />testing program has not been provided. Therefore, the following <br />stipulation is proposed: <br />Within 90 days of permit issuance the applicant must submit <br />a plan for soil testing. The plan should include sampling <br />,~ of different depths of soil and different topographic loca- <br />tions. <br />_92_ <br />