CANADIAN STRIP MINING AND RECLAMATION PLAN WYOMING FUEL CO - TECHNICAL AND ENVIRONMENTAL ANALYSIS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />tior~ using the data from Table 2 was tried. Assuming that the <br />5.5:1 overburden to coal ratio given by the applicant (page 26 <br />of 'iection 2.05 and page 7 of Addendum II) is correct, the equa- <br />tion for calculating coal volumes removed, based on the total <br />volume of coal plus overburden removed, is as follows: <br />Tons Coal = 1.12 (Total Volume Removed/ 1.16) <br />Using this equation the following yearly coal removal volumes <br />were calculated. <br />Year Coal Volume <br />1981 182,000 Tons <br />1982 260,000 Tons <br />1983 275,00 Tons <br />1984 300,000 Tons <br />1985 150,000 Tons <br />The total coal volume proposed for excavation using this <br />inettiod of calculation is 1,167,000 tons which also does not agree <br />with the total proposed coal production from paye 25 of Volume 1 <br />of the permit application. <br />Because of the problems with trying to verify the reclaimed <br />contours, overburden quantities and coal quantities, and the dis- <br />crepancies between data presented on the various pages, tables <br />and figures of the present permit application, the following <br />stipulaton is proposed. <br />Within 60 days of the granting of the permit (and before <br />beginning mining operations in Pit 21 the applicant must submit <br />the following: // <br />o A map or maps shoring the pits and reclaimed contours in <br />Pit 2 as they will exist at the end of each year. When <br />-57- <br />