My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12146
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:29 PM
Creation date
11/19/2007 2:27:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Application Correspondence
Doc Date
12/9/1980
From
OSM
To
SUNFLOWER ENERGY CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Hubbard Creels just upstream and doranstream of the <br />disturbed area. i~tonitoring ar_ these stations <br />should be on a monthly basis or during portions cE <br />the year when flow is intcrmittant, monitoring <br />should be done during each runoff event. ParameCcrr; <br />to be analyzed each time a sample is Lal<cn arc: <br />quantity, temperature, total and dissolved iron, <br />total manganese, TSS, TDS, pH, acidity (al.l.ali-nity), <br />Ca, Mg, Na, K, HC03, CO 504, and C1. Parameters <br />to be sampled on a one ~ime basis (or more iE high <br />concentrations are found) are nitrate nitrogen, <br />orthophosphate, and trace elements (i.e. Pb, Cd, <br />P.s, llg, h[o, Se, etc.). <br />The alluvial well ((~I-3050) should be monitored <br />quarterly for the same pararnetcrs listed above. <br />`Provide an assessment of hoca the small tributar:~ <br />to Hubbard Creek might be impacted L•y subsiclencc <br />if it occurs. <br />784.15 A demonstration of the feasibility of <br />land use for grazing must be made. <br />784.16 Provide a map sho.aing the seven drainage <br />areas described in the sediment pond calculations. <br />Provide a readable copy of page 106 of the applica- <br />tion. Clarify c~~hi-ch of the four ponds (1, 2, 3, <br />and 4) shocm on Lxhibit A correspond to the pond <br />calculations (ponds 25A, PJorth Sediment Pond, <br />South Storm Water Pond, Pond 1, Pond 2) given in <br />the application. <br />Provide speciFic dewatering pipe and overflow weir <br />designs fox- each of the four ponds. <br />Provide pond embanF:ment cross-sections showing top <br />widths, heights, slopes, locations of dewaterinf; <br />and overflow devices, locations of rip-rap, place- <br />ment of fine and coarse materials, seepage barriers, <br />cutoff trenches, etc. <br />Provide the results of any geotechnical investiga- <br />tions, construction materials investigations, etc. <br />done to provide data for design and construction <br />requirements. This is especially pertinent to Lhe <br />25 acre-foot pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.