My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12138
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:29 PM
Creation date
11/19/2007 2:27:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980002
IBM Index Class Name
Application Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />In March, 1979, an agreement was reached between Western State Collene <br />and Macar Lorporation to collect samples from the 0 C Mine, have the samples <br />' analyzed, and have the data supplied to Macar Corporation. <br />In August, 1979, an agreement wa:: reached between Flu+co A. I~'crchau, Inc. , <br />' and Macar Corporation to do additional water sampling, to collect :oils data <br />to determine the vegetation of the :>rea, and to provide a rec]amntipn proposa]. <br />' Because of the lateness of the season, some of the data is beinf, presented in <br />a preliminary report; an addendum and clarification will be provided in <br />July, 1980. <br />Because this report is presented as a part of a package, and because <br />other components of the package have provided particulars re~•,ard~ing the mine, <br />' no attempt will be made to repeat that information. <br />' WATER ANALYSIS <br />Sampling sites were selected within the mine for the March s.unp].in~*. <br />' Parameters to be considered are: cadmium, sodium, lead, manganese, zinc, <br />' selenium, nitrate, chloride, sulfate, and sulfide. Parameters added in <br />October, 1979, for the Nu-Mine adit and the O C Mine workings which flow <br />' out of the Nu-Mine adit (to be sampled only once per year) are: Total <br />Suspended Solids, Total Dissolved Solids, pll, and Rlectrica7. Conducti.v.ity. <br />' The original direction from the Co]orado Mined Land Reclamation Boarc] <br />' was to sample one time, and then a samplinP periodicity would be estab]ished. <br />The original sample was taken in March. fn September, a decision was made <br />' to sample quarterly. Because the time sequencing was out-of-phase, it <br />was decided to sample in October, November, and Rebrun.ry. Ilerenfter, the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.