Laserfiche WebLink
iii, iiiiiiiiiiiiiiii <br />RECEIVED <br />APR 2 7 1931 <br />MINED LAND RECIAMATIONCOAL'. <br />COLO. DEPT, OF NATURAL RESOURCES <br />Mr. Bob Liddle <br />Department of Natural Resources <br />Mined Land Reclamation <br />423 Centennial Buidling <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Mr. Liddle: <br />SNOW MASS COAL COMPANY <br />Denver O//ice: Suitt 2300 <br />410 Seventeenth Street <br />Denver, Colorado 80202 <br />(303) 8251966 <br />Mine O/lice: P.O.~ Box 980 <br />Carbondale, Colorado 81623 <br />(303j 963-3440 <br />April 24, 1481 <br />Snowmass Coal is requesting permission to use the 113 Mine conveyor <br />to transport coal from the 113 Mine to the breaker building prior <br />to having the splash pans installed, Snowmass is reopening L~he 113 <br />Mine and is constructing sumps underground to handle the water being <br />produced underground. I <br />The mining of the sumps will be a low tonnage rate at approximately <br />50 ton/day. This will result in a very minimal chance o£ anyi coal <br />spillage occurring. The duration of the coal haulage will bie kept <br />to a minimum of approximately one week, <br />Thank you very much for your consideration of this matter, <br />Sincerely, <br />~~ <br />Stephen Self <br />Chief Engineer <br />/lyd <br />