Laserfiche WebLink
Northfield Mine Permit Review <br />June 15, 2007 <br />Page 4 <br />Ground Water Regulation No. 41. This should be done for at least the initial baseline <br />collection period. <br />10. Tables 1 and 2 on pages 7 and 8 of the Hydrologic Monitoring Plan should have Surface <br />Water and Groundwater added to the titles of each table, respectively. <br />11. Based on the results of the groundwater monitoring plan a determination will be made <br />regarding the mine sites potential to negatively impact groundwater quality. If deemed <br />appropriate by the Division, one or more points of compliance shall be established. <br />Please let me know if you have any questions regarding my review. <br />C: Denver File <br />