Laserfiche WebLink
Byckfilling and Grading <br />- In order to verify pit and fill volumes for bonding purposes, as <br />well as to document the feasibility of the final reclamation <br />configuration, a topographic survey and swell factor determination <br />as specified in the original permit application and Findings of <br />Compliance document will need to be submitted. <br />With the exception of a portion of the hydrologic data, the specified <br />information has not been submitted. A Letter of Agreement specifying a <br />timeframe for resolution of the identified concerns was drafted by the <br />Division and sent to the operator on June 2, 1989, but the operator has <br />declined to sign the Letter of Agreement. <br />DTM/yjb <br />0179E <br />