Laserfiche WebLink
<br />-2- <br />or pond on the surface of the bench. A riprapped ditch will probably be <br />necessary to safely discharge runoff from the pad area and some type of <br />sediment control will be necessary below the bench, adjacent to the <br />railraod tracks. <br />Conveyor equipment is on site, but has not yet been set up. The loadout <br />is scheduled to be operational by March, 1983. The sediment control and <br />open coal storage issues shiould be addressed prior to coal storage at the <br />site. Since construction has already occurred, AVF and topsoil issues <br />are not so critical. <br />/ys <br />Doc. No. 316 <br />t <br />., <br />