Laserfiche WebLink
<br />STATE OF COLORADO R,GHnRD D ^nv~.,nn. Ott ~I~~I~~II~~II III <br />DEPARTMENT OF NATURAL RESOURCES 999 <br />D. Monte Pascoe, Executive Director <br />M LN ED LAND H ECLAIVIA'I'lON <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />September 21, 1982 Director <br />\` <br />T0: Sandy Emrich \) ~/~I~. <br />FROM: Jim Pendleto~~ ~:..~Y`-''`-~-_-~ <br />RE: Completeness of assigned Sections of the Foidel Creek Underground <br />Coal !•Tine Permit Application <br />Pursuant to your request, I have reviewed the following sections of the Foidel <br />Creek application for completeness: <br />RULE <br />TOPIC OF CONCERN <br />2.05,3(6) Temporary placement of overburden and underground <br />development waste. <br />2.05.3(6)(a) BZasting plan. <br />2.05.3(6)(b) and (c) Permanent disposal of spoil or underground development <br />waste. <br />2.05.3(8) Coal processing waste. ' <br />2.05.3(9) Disposal of underground development waste. <br />2.05.3(IO) Returning of coal processing waste to mine workings. <br />2.05.6(3)(b) Subsidence aspects of probable hydrologic consequences. <br />2.05.6(6) ~ Subsidence survey and control plan. <br />2.06.7(3) Variances from contemporaneous reclamation. <br />9.08 Explosives. <br />9.09 Underground development waste. <br />9.10 Coal processing waste. <br />9.20 Subsidence control. <br />9.22 Concurrent surface and underground mining. <br />~M <br />