Laserfiche WebLink
!5 <br /> <br />• <br />2.05 Minimum Requirements for Operation and Reclamation Plans <br />2.05.2 Operation Plan - Estimated Area for Life of Operation <br />2.05.2(2) <br />2 <br />WF must attempt to describe future progress for the life of the operation. <br />The Division realizes such information is only a rough approximation, but as <br />the BLM lease I/30168 extends to the northeast of the desired permit area into <br />Sec. 3,'WF must provide information on projected operations in th~s area and <br />a map showing probable areas of disturbance by phases. <br />2.05.3 Operation Plan - Permit Area <br />2.05.3 (3) (b) (i) (C) <br />We should provide the approximate date of crustier construction. <br />2.05.3(3)(c) <br />WF must provide specifications of each road including overall gra~}es, pitch <br />grades, and all other information required by Sec. 2.05.3(3)(c)(i . <br />As per the request to accept the culvert installation in Bush Dral, this will <br />be acceptable to the Division provided all information required b~ Sec. 4.03.1 <br />(1)(e) are provided and show the installation shall remain stables <br />2.05.3(4)(d) <br />WF has failed to provide details of the diversion and collection ystem existing <br />in the Pit 111 operations area. All ditches other than Diversion~Ditch D have <br />no design information provided. No design information is provided for Pond 2 <br />and Pond 3. All information on the sediment control system for P~t 111 required <br />under Section 4.05 must be submitted. <br />2.05.3(6)(b) <br />WF must submit justification of all reclamation cost figures. Cot <br />... .. and Cat Book costs are acceptable, but costs based on Wyoming Fue: <br />and Operatoos are not, as should WF default the costs incurred by <br />would more approximate those of a contractor. Estimated costs foi <br />sediment pond reclamation should be detailed as to volume of mate <br />moved, areas to be mulched, seeded, etc. Equipment used in each 1 <br />reclamation should be specified and the time and distanced travels <br />given to verify costs. Operator wages must be included in reclam: <br />estimates. WF should include fence replacement costs in their rep <br />estimate. <br />2.05.4 Reclamation Plan <br />2,05.4(2)(e)(VII) <br />tractor costs <br />equipment <br />:he state <br />road and <br />.als to be <br />ease of <br />1 should be <br />:ion cost <br />~amation cost <br />Please provide a soil testing program for the evaluation of topsoi!1 storage and <br />