Laserfiche WebLink
O <br />FLATIRON <br />COMPAN/ES <br />• ,~w~~~ III IIIIIIIIIIIIIIII <br />MAY o4 19a1 <br />~11NEU L4ND SCI-4MATION-COAL <br />SOW OEpi OF NATURAL RESOURCES <br />POST OFFICE BOX 229, BOULDER, COLORADO 80302 PHONE: (303) ddd-2151 <br />April 30, 1981 <br />Mr. Mike Savage <br />Reclamation Specialist <br />Mined Land Reclamation Board <br />1313 Sherman Street, 4th Floor <br />Denver, CO 80203 <br />Dear Mike: <br />Thank you for forwarding the summary of your recent site inspection <br />of the Bourg Pit. <br />In response to part III, problems connected with the load out facility, <br />please note the following information. <br />1. The salvaged topsoil will be seeded and mulched by <br />May 8. <br />2. Track marks will be smoothed and seeded by May 15. <br />3. The sediment control plan for the load out submitted <br />in the permit is resubmitted herewith. It will be <br />constructed upon division approval. <br />Sincerely, <br />(Mrs.) Margaret Winter <br />