Laserfiche WebLink
The DSFS identified a need for monitoring of water sources (springs and stock <br />ponds, etc) above areas to be retceat mined during the grazing season. The <br />monitoring would be required monthly unless the District Ranger determines a <br />different frequency is necessary. This commitment was made in the permit <br />application and therefore, a special condition was not needed in the State <br />permit or mining plan approval. <br />Additional mitigative stipulations are included in the Colorado MLRD renewed <br />permit. <br />1~+o special conditions of the existing mining plan approval are no longer <br />necessary. Special Condition 5 required the addition of the United States of <br />America to the bond as a co~bligee. This has been done. Special Condition 6 <br />stated that the_mining plan approval does not affect the outcome of the (then <br />current) challenge to the Federal permit before the Interior Board of Lands <br />Appeal (IBLA). A decision on the merits of the case was issued by the IBLA on <br />September 27, 1985, and on the issue of relief on November 18, 1986. No <br />additional conditions were required by those decisions. <br />PREVIOIIS ENVIRONMENTAL IMPACT STATEMENTS AND ENVIRONMENTAL ASSESSMENTS <br />Environmental studies on the Mt. Gunnison No. 1 mine prepared by Federal <br />agencies include the following documents: <br />BLM. 1979. West Central Colorado Coal Environmental Statement. <br />Site specific impacts of the current operations at the Mt. Gunnison No. 1 mine <br />were discussed in the the following documents: <br />OSlgtE. August 1481. Mt. Gunnison No, 1 Mining Plan Approval <br />Environmental Assessment. <br />OSMRE. August 1985. Mt. Gunnison No. 1 Mining Plan Modification <br />Environmental Assessment. <br />OSlQ2E. September 1985. Mt. Gunnison Hine Mining Plan Modification <br />Environmental Assessment. <br />PREPARERS <br />This environmental assessment was prepared by: <br />Floyd McMullen, Project Leader <br />Mel Granberg, Senior Project Manager <br />-10- <br />