Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTH(ORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (H): <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (I ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (S) <br />..______I__________________________________________________I___________ <br />5 ~ Topsoil Distribution on Pads, Pits and Roads ~ 598,277 <br />Subtotal (J): (98,277 <br />Subtotal (M): f9, 741 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 5387,575 <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (S) <br />-_______I__________________________________________________I____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ f6,007 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ (3,779 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f38, 758 <br />4. I Job Superinterxlent.. <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (dii <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description <br />________I__________________________________. <br />1. ~ Contract Prep., Eng. Fees..... <br />2. ~ Staff Adnin. Expenses......... <br />Subtotal (A): f48,544 <br />act plus 0 8 P): (436,119 <br />Cost (S) <br />_______________I_..______~ <br />4.25% of cntr.~ f18,535 <br />0.75% of cntr.~ 53,271 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): 521,806 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 570,350 <br />TOTAL PER FORMIINCE BOND AMOUNT (direct plus irxii rect costs): (457,925 <br />