Laserfiche WebLink
<br />Col®rado Ya ~ a Coal Coaa~~aa~ <br />A Subsidiary of Getty Coal Company <br />.Tune 7, 1982 <br />Robert Liddle <br />State of Colorado <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />RE: Mine li3 Reclamation Activities Planned <br />Dear Bob: <br />iii iiiiiiiiii <br />Steamboat Springs, CO 80477 <br />(303) 870-3800 <br />~. - k.- ., [~ a <br /> <br />is'1ith=U !.Af3~ i?`;;':_Ai':1•.11Giu <br />CO'.D. 1)d;;?. pi I'~3,~•Ji2i ~,?S•1.4fA° <br />In response to your request addressed in Part II, 2,14 of your inspection <br />report dated May 26, 1982, a brief description of the planned order of <br />reclamation at aline No. 3 is herein submitted. <br />The general sequence of reclama[Ion activities is: <br />1) Southern portion of the pit and spoil area; <br />2) Access road to the permanent overburden stockpile; <br />3) Permanent overburden stockpile; <br />4) Detention basin; <br />5) Northern portion of the spoil area; <br /> <br />Rougfi grading and final grading are planned to be completed by the end of <br />September on all of the above areas. <br />Topsoil reapplication is also expected to be completed by the end of <br />September, weather permitting. If topsoiling operations are not completed this <br />fall, they will be completed as soon as possible in early 1983 <br />Revegetation (seeding) operations will take place on all areas which have <br />had topsoil replaced by the end of September. <br />Any topsoil reapplication and revegetation operations which are unable to <br />be conducted prior to winter 1982, will he intiated as soon as weather permits <br />in spring 1983. <br /> <br />