Laserfiche WebLink
7. Access road layout <br />a. centerline plan <br />b. traverse tie to <br />c. classify soil - <br />d. culvert design <br />8. Maps and Plans <br />TIME SCHEDULE <br />and design (4.03-2 CMLRB) <br />and profiles <br />existing access road <br />shallow core <br />, locations <br />A. Dorchester Existing Waste Area <br />1. East end 1st priority <br />2. Existing area 2nd priority <br />B. G.E. C. Proposed waste area <br />1. Proposed waste area 3rd priorty <br />Note: depending on weather conditions. <br />FEE SCHEDULE <br />A. Dorchester existing waste area <br />B. GEC Minerals proposed waste area <br />2 weeks <br />30 - 40 days <br />45 days <br />Minimum Maximum <br />$7,540.00 $9,925.00 <br />$7,350.00 $9,550.00 <br />The above services will be preformed by the following hourly fee <br />basis. <br />Engineer <br />2 man survey crew <br />3 man survey crew <br />Design Draftsman <br />Draftsman <br />Computer Computations <br />Core Hole Drilling Machine <br />W/ operators <br />Miscellaneous Expenses <br />$32.00/hr <br />$45.00/hr <br />$55.00/hr <br />$20.00/hr <br />$16.00/hr <br />$35.00/hr <br />$45.00/hr <br />Actual cost incurred <br />PAYMENT SCHEDULE <br />Retainer $3,500.00 <br />Statements on Bi-Monthly Basis <br />Any deviations from this proposal involving extra costs will be <br />executed only upon written orders, and will result in an extra charge <br />over and above the estimate submitted in this proposal. <br />Sincerely, <br />J.E. ALESSI b ASS LATES, INC. <br />. ALESSI <br />JEA:pa <br />