Laserfiche WebLink
Flom: Wllllam P. Belaz To:.Dave Berry Date: 8/9QIp5 Tlme: 1:39:26 Pepe 4 of 4 <br />management and contract negotiations. Prior to being associated with fQ.H Engineering, Mr. <br />Shepherd had extensive experience at Arch Mineral Corporation's Seminoe #1 and Medicine Bow <br />Coal Mines in Wyoming. He was Chief of Surveys for surface pit coal mines and was responsible <br />for monthly production reports for royalties involving quantity surveys, calculations, daily <br />mme-related stripping, production and reclamation surveys, baseline control (horizontal and <br />vertical) for photogrammetnc mapping sectional boundary surveys and drill hole surveys. <br />O David J. Casalman, Survey Party Chief, with over 17 years of experience in surveying. He has <br />extensive experience with geodetic control surveys, including second and third order traverses Cor <br />conrol of present and future ntming operations, power lines and numerous topographic mapping <br />projects in Colorado, Utah and Wyoming. He rs also trained in t3PS. <br />The undersigned agrees [o comply with all the Rules and Regulations of the Colorado Surface Coal Mining <br />Reclamation Act, the Creneral Conditions of [he Purchase C?rder and the Purchase Order Tenns and Conditions and all <br />other requirement, of these documents: <br />Individual or Company Name: William P. Balaz Jr. <br />Professional CeRificetion No. 17129 <br />Signature: /./~~(; ,jam, -~/ Date: 8/30/95 <br />Address: 203 Sunset Circle <br />Palisade Colorado 81526 <br />Phone: (970) 464-7942 <br />9,~ <br />~~L <br />,i°'o '9G ~C'~~L <br />00 <br />~yo ~ ~`~ <br />P~~~s 99f <br />~~ <br />Poi <br />09 <br />.L <br />Pagz 3 <br />