Laserfiche WebLink
I III IIIIIIIIIIIIIIII ~ <br />~~ <br />July 14, 1986 <br /> <br />Mr. Peter O'Connor <br />Mined Land Reclamation Division <br />423 Centennial Building ~~~~ i 6 ~98~ <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: BLUE FLAME COAL MINE APPLICATION FORM <br />Dear Peter, <br />Blue Flame Coal Mine has revised points 15 and 16 of the application form to <br />reflect acreage per the discussion under this topic of the Mined Land Reclam- <br />ation Division's Adeouacy Review Letter No. 3. <br />2.03.4 Identification of Interests <br />Mr. Huntington and the Ute Mountain Ute's are the legal surface owner's of record. <br />This has been addressed in the application and the Blue Flame Coal Mine has sent <br />certified letters to each, requesting what they intend to use the land for after <br />Blue Flame Coal Mine has reclaimed the mine surface pursuant to Rule 2.05.5(2)(b). <br />As of this time, Blue Flame has not received any correspondence from them. Please <br />see the attached copies of said letters. <br />2.03.9 Personal Injury and Property Damage Insurance Information <br />1. Blue Flame Coal Mine has notified our insurance agents to revise the rider <br />that appears on the latest copy you have received. They have committed to <br />notifying the Mined Land Reclamation Division if any changes are made it the <br />insurance policy or any failure to renew occurs. <br />2. Blue Flame Coal Mine will revise all pages where changes were made during <br />the adequacy review process. It is understood the Division will not inter- <br />lineate the words requested. Blue Flame Coal Mine commits to revising <br />these changes and omitting all revised changes where changes have been made <br />prior to final approval of the permit application. <br />2.04.7 Hydrology Description <br />1. Blue Flame Coal Mine has committed to monthly water quantity and to quarterly <br />water quality sampling. Blue Flame Coal Mine takes the Division's sugges- <br />tion that Blue Flame Coal Mine eliminate the timetable and allow the text <br />to stand on its own with the specified commitments. Blue Flame Coal Mine <br />also accepts the Division's suggestion to submit water quantity measurements <br />along with water quality measurements on a quarterly basis. <br />2. Blue Flame Coal Mine has depicted the location of the 500 gallon portable <br />plastic water tank on Map 1. As indicated previously, this 500 gallon plas- <br />tic water tank will be portable and most likely left in the back of a pick-up. <br />