Laserfiche WebLink
<br /> <br />Mr. Derry Ferguson - 8 - June 21, 1993 <br />Sec dly, on the same page, the applicant states that at the bottom of <br />- e reclaimed "low wall", "a line of boulders will be placed to <br />encourage stability". This should be deleted, as a line of boulders <br />obably won't add any stability to the slope. <br />36. First, Map 5-6 discusses cast blasting into the pit for backfilling, <br />which will not be allowed, as the pit must be backfilled with excess <br />spoil. Please review Map 5-6 to remove references to: (a) backfilling <br />~~ <br />~_;~ the pit with blasted material; (b) backfilling the p1t with material from <br />`~} the gravel pit to the south; and (c) backfilling the pit with material <br />from the north. <br />If you have any questions concerning these adequacy issues, please do not <br />hesitate to contact me. <br />Sincerely, <br />Daniel I. Hernandez <br />Senior Reclamation Specialist <br />DIH/ern/scm <br />7730E <br />