Laserfiche WebLink
-6- <br />INFORMATION CATEGORY <br />2.05.3(7) Coal Handling Structures <br />2.05.3(8) Coal Processing Waste and <br />Non-Coal Processing Waste <br />2.05.3(9) Underground Development <br />Waste <br />2.05.3(101 Return of Coal Processing <br />Waste to Abandoned <br />Workings <br />2.05.4 Reclamation Plan <br />2.05.4(2)(a) Timetables <br />2.05.4(2)(b) Reclamation Cost Estimates <br />2.05.4(2)(c) Backfilling and Grading <br />2.05.4(2)(d) Topsoil (Redistribution) <br />2.05.4(2)(e) Revegetation <br />2.05.4(2)(f) Disposal of Debris, Acid- <br />Forming and Toxic-Forming <br />Materials <br />2.05.4(2)(9) Sealing or Managing Mine <br />Openings, Exploration <br />Holes, Other Boreholes or <br />Ne11s <br />?.05.5 Post-mining Land Uses <br />2.05.5(1)(c) <br />2.05.6 Mitigation of the Impacts <br />of Mining Operations <br />2.05.6(1) Air Pollution Control Plan <br /> <br />Location in A lication <br />NARRATIVE MAPS <br />5-20 5-1 <br />5-21 N/A <br /> <br />5-23 N/A <br />5-24 N/A <br />5-24 5-4 <br />5-24 See Tables <br />Appendix <br />5-7 <br />5-6 <br /> <br /> <br />5-24 *Post-mining <br />topography - 5-4 <br />2.05.4(2)(c) <br />5-24 5-3 <br />5-24 5-5 <br />5-24 N/A <br />5-24 N/A <br /> <br /> <br />5-31 *Post-mining land <br />use - or <br />or (2)fc) 5-6 <br />5-31 N/A <br /> <br />5-31 N/A <br />