Laserfiche WebLink
1 ~ 1 <br />~' <br />Stipulations <br />Xerr Coal Company <br />Ma rr Strip; Ma rr Prep Plant <br />/ 1~ Y.ERR COAL IS REQUIRED TO CONSTRUCT ALL DITC!!ES USING TIfE DESIGN GRADES <br />l~ RATHER TN,1N T1fE GRADES SHOtJN OfJ MAP 16a. IF TN IS REQUIRES RELOCATING AN'f <br />DITC1fES FROM THE LOCATION SHOWN ON THE MAP, TNE1J A REVISED MAP 16a MUST BE <br />SUBMITTED AT THAT TIME. <br />2. XERR COAL IS DIRECTED TO SUDMIT A TIMETABLE FOR INITIATING ALL ASPECTS OF <br />THE MONITORING PROGRAM DESCRIBED ON PACES 7B0-109aaa AND bbb. G'E REQUIRE <br />TI175 INFORMATION TO 8E SUBMITTED BY SEPTEMBER JD, 1981. IN ADDITION XERR <br />COAL IS REQUIRED TO SUBFfIT TO THE DIVISION A k'EARLk' REPORT ON TIfE PROGRESS <br />OF MONITORING IJHICN INCLUDES ALL DATA COLLECTED FOR THAT YEAR AND A DIS- <br />CUSSION AFlY CONCLUSIONS Wlf !Cif CAl! BE DRAWN FROM Tiff DATA. KERB COAL SHOULD <br />WORX CLOSELY IJITH TIfE DIVISION AS THE PROGRAM IS DEVELOPED AND ~NODIFY TO <br />I,VS URE THAT COMPREHENSIVE BUT EFFICIENT MONITORING (JILL TA XE PLACE. <br />3. THE APPLICANT SHOULD RE-ANALYZE AND RE•SUDFIIT THE EXISTIJJG DATA IN TADLE 1D <br />TO CONSIDER THE EFFECTS OF COAL DUST ON WATER OUA LITY I.'J THE ADJACENT SJJAhIP, <br />OR ALTERNATIVELY THE APPLICANT SNOULP REDESIGN THE IJA TER h10F17TOR I7JG PROGR,IM <br />AT THE TIPPLE TO COLLECT USADLE DATA. TlJIS INFORMATION SlfOULD BE SUBFITTED <br />TO TIIE DIVISION NO LATER TfIAN APRIL 1, 1981. <br />....R ~.. <br />4. XERR COAL COMPANY IS REQUIRED TO SUDIJZT A PLAN TO Tlf IS DIVISION, ;JO LATER <br />THAN SEPTEMBER 30, I~BI, FOR MINIMIZING THE D£PLETInFJ OF .FDA TER FROf4 SUDDUTH <br />DRAW CAUSED DY GROUND [DATER IJJFLO[JS DISCHARGING INTO PZT NO. 3. ANY FfEASUREMENTS <br />WHICH THE DIVISION DETERMINES TO BE NECESSARS' TO ALLEVIATE TIfIS POTENTIAL PROBLEM <br />SHALL BE Ih1PLEMENTED PRIOR TO MINING ADJACENT' TO SUDDUTH DRAW. <br />~. KERR COAL IS DIRECTED TO lfONITOR IJA TER QUALITY FROF1 THE SPRItJG AT TfiE OLD <br />SUDDUTH FfINE r)UARTERLY FOR ONE YEAR, ACCORDING TO THE SAME PARAMETERS AS <br />OTHER HYDRCLOCIC MONITORING. RESULTS ARE TO DE SUBMITTED TO THIS DIYTS7071. <br />u. XER.4 COAL IS REQUIRED TO UPDATE THIS PER!fIT ACCOF DINGLY AS INITIAL OR FIIJAL <br />DECISIONS ARE RE170ERED RELATIVE TO PEIIDING E(1ISS IOFJS PEP.MIT APPLICA TIOFIS FOR <br />THE PROPOSED COAL hfI,VING ACTIVITIES. <br />.~ 7.) KERR COAL IS REQUIRED TO STRIP TOPSOIL FROM T1lE IMPOCJFJDMFNT AREA nv nrr <br />~~`// S_E DIMEFJT PONDS REJdA IFr T1!f: TO BE CONSTm1CTFn ff`Nf.E55 TIfE DIVZSIOI! SPEC IFZCA LLY <br />AUT!lORIZES LCA4'ZIJG T7l T.S TOPSOIL IFJ PLACC, DASED ON A DEhI01JSTRATION DY KERR <br />COAL T1fAT SEDIh1E1JT COLLECTED IN EXISTIIJG P01JDS FALLS IJITHIN THE PARR METERS <br />OF NORhfAL SOIL MATERIAL, ,1ND FURTHER THAT TlIE TOPSOIL DF:NEATIf SUCII ACCUF'ULATED <br />SEDIPIENT GOES NOT DEFICNSTRATE ADVERSE IFIPACTS FROM .S F.DI`IENT DEPO.SITI011 ~~R <br />M.Tr£R RETENTION OR Sf101J A TREND TO[JARD UNACCEPTABLE SOIL PA RAFIETERS. SUC!1 <br />DEMONSTP.ATION SIIA J.L RE DASED UPON TfIE RESIILTS Oh' T11E SED IFIENT AND TOPSOIL <br />SAMPLING PROGRAM PROPOSED DY KERR COAL, fJITH TIfE ADDITION OF TJfE FO LLO4JING <br />PARAMETERS TO T/lE ANALYSES: ARSE117C, 80ROFf, COPPER, LEAD, MERCURY, MOLY6DEFlUM, <br />SELENIUM, ZINC. IF Y.ERR COAL SffOULD C1f05E NOT TO IFJP LEAfEfJT TfiIS SAMPLING <br />PROGRAFI, TOPSOIL MUST ALSO UE STRIPPED FROFI T!!E E.CI.STING P^NDS. <br />9. [JTT/l RE.SPE!'T TO .SlI Pl/R Dlil/.'i7TY, A ./0T11T EFFORT f.S 'f0 11 P: MADE DY }.'ERR COA/. AF/D <br />TIffS DIVISION TO RF.:,EARC:I TIIE ISSUE 7F APPROPRIATE Sll R 1!9 DEIJSITIES, AfJD !,N <br />,1CCEPTADLE SUCCESS STAIIDARO £STABLISIIED NO LATER T/fAN SEPTEMMBER 30, 1981. <br />