Laserfiche WebLink
. ~ <br /> , <br />' ~' <br />,HI D, ~ IH •L~LY RtlLa TO <br />~' ",=~ `- United States Department of the Intenor 3400 <br />-fir C-033301 <br />.~L BUREAU OF UAND r.tANAGEM ENT ~ (161) NS <br />"e,+ Uncompahgre Basin Resource Areas - <br />`"' P. 0. Bor. 1269 <br />Ptontrose, Colorado 81402 <br />l;,qY ° v 1991 <br />hlemorandum <br />To: State Director, Colorado (CO-93°_) <br />From: District Manager, N~ontrose <br />Subject: Completeness Review of Revisions to Mine Plan Submitted <br />to OSh1 by Sunflower Energy Corporation for the Blue Ribbon <br />Kline, Federal Coal LLase C-033301 (Sublease from U. S. Steel <br />Corporation) <br />tly staff has reviewed the plan as requested by t•lemorandum from OSht to <br />your office (enclosed). I have the follovriny co~rnrents regarding the <br />subject mine plan: <br />1. ]n general, it appears that the material in the mine plan is the <br />same as that submitted for revievr in October 1981. The October <br />submittal vras in response to the Federal regulatory program vrhile <br />this most recent submission is in response to the State of Colorado <br />regulatory program. The organizational format for submittal under <br />both programs is not the same. Apparently, Sunflower Energy did not <br />attempt to reconcile the format differences in this latest submittal. <br />As a result, the plan is terribly disjointed in that the text plate <br />and figure references do not follow one another. ,Many plates could <br />not be located, and in several other instances the same plate nwnber <br />was used for tyro entirely different plates. <br />The disjointed nature of the mine plan made it near-ly impossible to <br />assess the completeness of the plan as submitted. Therefore, it is <br />r-ecorronended that Sunflower Energy be once again requested to resubmit <br />the plan with special detai' being paid to organization and content <br />per the Colorado State mine plan regulatory program. <br />2. Section 2.04.3, Plate 8, page 14. Could not find Plate 8. Should <br />r~er•ence be to Plate 9? <br />3. Section 2.04.6(1), Plate 3, ~a~e~49. No contour interval given for <br />structure contours. It is, in fact, very difficult to determine the <br />specific value of any of the contours shovrn. <br />" .: <br /> <br />