Laserfiche WebLink
<br />(SCHE~UCE TC "~OTIC.`_ OF VICCa7I0M) <br />Nacice of viol2tion ~io.-r10V - 81-32 <br />-------------------------- <br />•aArURE OF vIO~aTi7~ <br />Failuze to contemporaneously reclaim the pit bl mining area- <br />------------- °---------------------------~------------------- ---- <br />ACi OR PERHIT vRDVISIOr~(S) vI]lArEO <br />ALT SECTION(S) 39-33_120(2)(p) Rule 4-13 ___________`____ _________ <br />PERwIi SECTI]N(S)Amen dmen t_to Permit 79_531 Mineral Resources and En ginee ri~L_ <br />Zn c., response of~2/16/81- <br />- PORTION OF THE DPERATIGN TO 'aHICH THIS NOTICE avvCIES <br />-Pit b1. <br />STEPS NECESSARY TO A3ATE VIOLATION (RE!~ED[AC ACT(ON) <br />1. The operator must backfill, grade, retopsoil, and mulch and seed in accordance <br />with the approved plan and within 30 days. <br />TIY.E FOR A9ATEHENT (NOT MORE THAN 90 04YS): <br />ON OR gEF]RE September 7 `_, (q 81 <br />