Laserfiche WebLink
~~ «~ <br />~ ~ ~'y/fS <br />• <br />G-~. ~rJ~-90 <br />_~~TL~~_iF _V 1'.'11.~T1~S <br />VDTICE NO. Np~h_ 81-32 <br />Tp T4E OPERATOR OF THE `+I.`lE BELp'a Oi:SCRI?EO: <br />pcR;.IIT ,yp,_-_C-098-81 (79-53) MINE__Trinidad Basin Mine <br />-------------------- ----------------- <br />TYPE JF ~aIN"e_________ <br />COUNTY I,as 7lni ma.s <br />pPER.1TOR (CF pTHER THaN PERMITTEE) <br />PER~`+ITTEE_Trinidad Basin hfining;Inc. <br />MOIL o00RESS P.O. Box 783 <br />y~il ~ODRESS___________ <br />Trinidad, Colorado 81082 <br />DATE/Tf~4E OF INSPECTI~N_?~2G/81_ <br />INSPECTOR___ M.S. Savaye________-___ <br />3:00 P.M.; 7/77/81, 5:00 P.hf. <br />Certified Mail No. POG 6985161 <br />The !!fined land ReCldmdtiOn `JlviSiOn ("th? dlVi$Ipn") <br />• hes COnCUCCed do inSpeCtiOn Of the dbOVe mine and hd5 mdtle <br />the findings Seated. ~n iho attar nod schedule and has found <br />violations of the Colorado Surface Coal timing Reclamation <br />~Cts or viOldtiOnS of required permit ConditiOnS. listed in <br />*_he dCLdCned SChedul?. This nOC~Ce COnStitU[e5 d SeDdrdte <br />no*_ice of violation for each violation listed. <br />You must abace each of these violations within the des- <br />icnated abatement time. ::Here the remedial action r?qui"r es <br />submission of plans, the Mans are [o be submitted to the <br />division within the desishated time. You are responsible <br />for doing rill worK in a safe manner in Compliance with all <br />aoplicaole laws and ragulacicns. [f you have any questions, <br />please call the division. (303)839-3567. <br />The undersighed.finds tnat cessation of mining is ____ <br />is not __X __ expressly. or in practical effect. required by <br />tni5 nOCiCe. FOr this pUrpOSer "mining." means ?xtrdCt~n'3 <br />COaI ffOm the edf Ch Or From d waste pile dn0 CrdnSpOrtin~ it <br />ricnin or frog the mine sits. <br />~ThiS nOtiCe Shrill remain in effect until it expires a5 <br />provided Dy ldwr Or until it i5 .modified. terminated Or vaC3ted <br />in writi n~3 Oy an au LhOriZed re OreSen tdCive of the d~viSiOn. <br />or by tn? .`lined Land Reclamation 9oard. The time for abate- <br />ment may Je extended by do duthOriZeO representative Of [ne <br />divi5ion'if~fdilure to aGdt? 'within the time pr9vi0usly fixed <br />is not due to lacre of diligence. <br />C.R.S. 1973. 34-33-L2J18) Provides for imposition of <br />Civil Oendl ties Of up t0 SSr700 for each viCldtiOn rind pr0- <br />vide5 that 2d C:1 day Of COntinuinrl violation may be deemed 3 <br />seoarate violation. } O 8 <br />