My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11482
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:52 PM
Creation date
11/19/2007 2:20:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Application Correspondence
Doc Date
6/16/1983
Doc Name
PN 79-177 FOIDEL CREEK MINE STIPULATION 1
From
GETTY OIL CO
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i iii iiiriiiiiiii {11 <br />Getty Oil Company I 23385 Routt County Road 33, Oak Creek, Colorado 80467 • Telephone (303) 879-4426 <br />June 16, 1983 ~~~'~`~'~~ <br />Ms. Sandra Emrich, Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building f~il~•;LD I-Air©tiF.CLAP1~,~;TiGN <br />1313 Sherman Street Celo. Gep!. of Natural Resa~rces <br />Denver, CO 80203 <br />RE: Permit 79-177, Foidel Creek Mine, Stipulation No. ,1 <br />Dear Sandy: <br />This letter is in response to Stipulation No. 1 of the permit approval far <br />the Foidel Creek Mine. The stipulation reads as follows: <br />"To verify the applicant's predictions of stream depletions in the <br />area of the Wadge coal-overburden aquifer discharge area on Fish <br />Creek, the applicant shall install and monitor a set of nested <br />piezometers completed in the alluvium of Fish Creek overlying the sub- <br />crop of the Wadge coal-overburden aquifer. A plan shall be submitted <br />within 30 days and the wells shall be installed within 120 days of <br />issuance of this permit. The wells shall be monitored monthly for <br />water levels and the results of monitoring submitted quarterly to the <br />Division." <br />Twentymile Coal Company has set out a plan to install and monitor a set of <br />alluvial monitor wells in the Fish Creek floodplain. The monitor well system <br />includes a nest of six wells which are completed in the Fish Creek alluvium <br />overlying a fault zone. This highly fractured fault <br />eastern portion of the Twentymi.le park basin, and is <br />far the 'dodge coal-overburden aquifer. An additional <br />the alluvium of Fish Creek overlying the sub-crop o <br />aquifer. The well will be installed within 45 <br />submittal. The location of the monitor wells is <br />Energy. Mine No. 3 Ground Water Hydrology. <br />zone extends throughout the <br />the probahle discharge area <br />well is to be installed in <br />the Wadge coal-overburden <br />lays of the date of this <br />shown on the attached map, <br />The monitor wells will be monitored for water table elevation on a monthly <br />basis, and results of the monitoring will be submitted quarterly. The first <br />submittal will include all data collected as of the third quarter of 1983. <br />
The URL can be used to link to this page
Your browser does not support the video tag.