My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11465
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:52 PM
Creation date
11/19/2007 2:20:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Application Correspondence
Doc Date
7/12/1984
Doc Name
BONDNG CALCULATIONS FOR ENGERY MINE 3 AND MIDDLE CREEK PONDS
From
MLRD
To
FILE C-84-062
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. 6etcher4 ExecutNe Director <br />MINED LAND RECLAMATION DIVISION <br />DAVIDC. SMELTON, Dltector <br />Richard D. Lamm <br />Governor <br />DATE: July 12, 1984 <br />~ T0: File No. C-84-0~2 <br />FROM: Sandy Emrich <br />RE: Bonding Calculations fot Energy Mine No. 3 and Middle Creek Ponds <br />CYCC proposed two permanent impoundments in the Energy Mine No. 3 permit <br />application. Because they are permanent no bonding coats were figured. The <br />Division ie not recommending approval for the permanent impoundments and, <br />therefore, the ponds must be included in the reclamation coat estimates. I <br />have calculated the coats ae follows. <br />Energy No. 3 Detention Basin - approximately 30,000 yd3 needed for fill, <br />about 2 acres disturbance. <br />Middle Creek Detention Basin - approximately 8,000 yd3 needed for fill, <br />about 1 acre disturbance. <br />Backfilling - 1 dozer - Cat D9L <br />38,000 yd3 = 440 yd3/hr = 86 hours <br />86 x $45.00/hr operating cost = $3,870.00 operating cost <br />86 x .75 efficiency = 115 hours <br />$5,690.00/wk x 1.05 (location adjustment) x 3 wks = $17,924.00 <br />Grading - 1 16G grader, assume 1 acre/hr <br />3 acres x 1 hr/acre 3 hours <br />3 hre x $28.80 operating coat $86.00 <br />3 hrs _ .75 efficiency 4 hre <br />4 hrs x $177.50/hr x 1.05 = $745.00 <br />Topeoiling - 1 scraper Terex TS-24B 270yd3/hr. Assume 1 ft topsoil over <br />area (130,680 ft3) <br />4840 yd3 topsoil 270 yd3/hr = 18 hours <br />18 hre x $77.10 operating coat $1,388.00 <br />18 hra .75 efficiency 24 hre <br />3 days x $2590.00/day x 1.05 $8,158.00 <br />Seeding - 3 acres @ $241.00/acre <br />3 x $241.00 $723.00 <br />Total Reclamation Cost: $29,024.00 <br />Rounds out to: $29,000.00 <br />/ph <br />Doc. No. 2462 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 8663567 <br />• iii iuiiiiiiimiii <br />
The URL can be used to link to this page
Your browser does not support the video tag.