Laserfiche WebLink
Lorencito Canyon Project <br />Proposed Exploration Plan <br />Winter of 2000-2001 <br />Table 1. Detailed Description of Drilling <br /> <br /> <br />Area <br />Hole <br />Desl nation <br />Estimated <br />De th (etl Est. Time <br />to Complete <br />(da i <br />Highest <br />Coal Bed <br />Lowest <br />Coal Betl Est. No. <br />of Splits to <br />Anal xe <br /> <br />Comments <br />P7 throw h P9 LCP-1 75 0.75 Primero Primero 5 Pro osetl Contour Cuts on Primero Seam <br /> LCP-2 75 0.75 Primero Primero 5 <br /> LCP-3 75 0.75 Primero Primero 5 <br /> LCP-4 75 0 75 Primero Primero 5 <br /> LCP-5 75 0.75 Primero Primero 5 <br /> LCP-6 75 0.75 Primero Primero 5 <br /> <br />Area 4-2 LCP-7 230 1.5 R or Ciruela N 22 <br /> LCP-8 215 1 5 R or Cimela N 22 <br /> <br />Area 4-1 LCP-9 255 1.5 R or Cimela N 22 <br /> <br />Area 4-3 LCP-10 220 1.5 R or Ciruela N 22 <br /> LCP-11 225 1.5 R or Ciruela N 22 <br /> <br />Area 3-1 LCP-72 250 1.5 R or Cimela N 22 Ma not be able to et the drill above the R <br /> <br />Area 2-1 LCP-13 60 0.75 'u er O s lit' "lower O s lit' 9 <br /> <br />Area 2-2 LCP-14 275 1.5 Oa N 14 <br /> <br />Area 2-3 no holes ro osetl <br /> <br />Area 2-4 LCP-15 205 1.5 T N 26 <br /> <br />Area 1-1 antl 1-2 no holes ro osetl <br /> <br />MTR-R LCP-16 270 2 S 0 24 <br />Total 2,615 19.25 234 Assume 4 to 5 weeks at 6 da s er week. <br />l I <br />u <br />Notes <br />7. "LCP' is Lorencito Canyon Proposetl core hole location. The actual location and tlesignation may vary. <br />