Laserfiche WebLink
~ ~ • • <br />Completeness Comments -4- <br />Reclamation Plan - Rule 2.05.4 <br />1. The application does not contain any post-mining contour maps or <br />cross-sections. These must be incorporated Into the permit application in <br />accordance with Rule 2.05.4(2)(c). <br />~ 2. The application contains no detailed timetable for the completion of <br />each mayor phase of the reclamation process. A timetable addressing the <br />requirements of Rule 2.05.4(2)(a) must be incorporated into the permit <br />application. <br />J3. The application contains no descriptions or drawings showing the <br />measures that will be taken to seal the mine openings and drill holes as <br />required by Rule 2.05.4(2)(8). <br />Post-Mlnina Land Use - Rule 2.05.5 <br />J 1. Landowner comments on the post-mining land use are stated on page 4-78 <br />of Volume 1 of the application to be 1n Appendix 4.4-1. This section is <br />blank. The permit application must be updated to include these comments. <br />Alluvial Valley Floors - Rule 2.06.8 <br />1. The application contains no map of lands that are currently or were <br />J historically flood irrigated, showing the location of each diversion <br />structure, ditch, dam and related reservoir and topography of those lands as <br />required by Rule 2.06.8(3)(b)(11). This map must be submitted in order for <br />the application to found complete. <br />J2. The application contains no documentation of sublrrigated areas as <br />required by Rule 2.06.8(3)(b)(iv). These areas must be shown on a map and <br />supporting evidence must be included 1n the permit application. <br />/ph <br />Doc. No. 0179 <br />