Laserfiche WebLink
~4 I <br />III III III III IIII III <br />DEPARTMENT OF NATURAL RESOURCES <br />David h. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richard D. Lamm <br />Governor <br />March 1, 1984 <br />Nr. Dean Massey <br />Dorchester Coal Company <br />9350 E. Arapahoe Road <br />Suite 300 <br />Englewood, Colorado 80112 <br />Re: Certification of Pond No. 4 <br />Dear Mr. Massey: <br />The Division received your February 23, 1984 certification report for Pond <br />No. 4. This letter is written to Inform you of some concerns the Division has <br />identified over the certification you submitted. <br />The certification letter should certify that the pond was constructed <br />according to the approved designs. Your certification, conducted by Rocky <br />Mountain Geotechnical, Inc., indicates that the pond was not built according <br />to the approved designs and, in fact, recommends a modification to the pond. <br />In order to resolve this issue, Dorchester Coal Company will need to revise <br />the designs in the application as part of a technical revision. After the <br />designs have been approved and reconstruction completed, the certification <br />should be redone. <br />Please call 1f you would like to discuss this matter. <br />Sincerely, _ <br />/ 7 ' <br />,~ -. <br />Robert G. Llddle <br />Reclamation Specialist <br />RGL/mmt <br />Doc. No. 9739 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (30~) 866-3567 <br />