My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11351
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:41 PM
Creation date
11/19/2007 2:19:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Application Correspondence
Doc Date
11/18/1981
Doc Name
BOURG MINE INSPECTION REPORT DATED NOVEMBER 5 1981 & YOUR LETTER DATED NOVEMBER 9 1981
From
FLATIRON COS
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />FLATIRON <br />COMPAN/ES <br />^iii iuiuiiiiiu iii <br />999 <br />POST OFFICE BOX 229, BOULDER, COLORADO 80306 PHONE: (303) 444-2151 <br />November 18, 1981 ~ '~_ i;~ <br />~:..--- <br />Mr. Mike Savage <br />Mined Land Reclamation i~OV ~ - 1981 <br />423 Centennial Building <br />1313 Sherman Street f;ui° ~ rrtP~1 I'.' 7'.{'.. ''•:i'''`! <br />Denver, CO 80203 Colt. C~!;'. ~: , a'~''I ~':.''' ~-. <br />Re: Bourg Mine inspection report dated November 5, 1981 and <br />your letter dated November 9, 1981 <br />Dear Mike: <br />The Walden Coal Company requests that it not be required to complete <br />the construction of sediment pond "C" at this time. Walden Coal would like <br />to undertake further research to determine the feasibility of the present pond <br />"C" plan. <br />As you have observed during your inspections, the pond and dam, less <br />the spillway, have been constructed. As an interim measure, Walden Coal <br />would propose to construct a ditch from pond "C" to sump "B". This ditch would <br />carry the pond "C" outflow, insuring that sediment would have adequate <br />opportunity to settle. <br />Walt and I appreciate the time you and Fred spent with us on November 9th. <br />We felt the meeting improved the relationship between the MLRD and Walden <br />Coal. We are committed to keeping the communications open with the MLRD. <br />Sincerely, <br />`~ <br />Scott A. Patten <br />Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.