Laserfiche WebLink
~~ <br />.:. <br />,, <br />near the river. Please refer to section 817.81 et seg. The <br />proppsee <br />The proposed drainage control plan tfi the area between the new <br />ventllatlon entry and topsoil borrow area may create more dlstur- <br />banee then is really necessary to tr~et drainage. from tho Brea. <br />Refer to sections 817.u?(4) and 817.153 to Aesinn iho road drain- <br />age system. Drainac;r_ from the topsoil borr~~naeoa and'face up area <br />can be con [rolled with bar^~s or wall sedin•r•nt ponds. ?&ha uplanA <br />unaffocteA dralnago area appears to be smail and heavily 6regetated. <br />There Is probably no need to divert this upland drainage. <br />tlo area fora topsoil stockpile has been tAentifled. <br />.. Lross sectlon diagram of Berm of Sp•bils Pile. <br />The cross sectlon of tlir_ berm at the refuse pile should show heavy <br />rip rap to the 100 year flood line. The site inspection revealed <br />water at the base of the refuse pile in whet has been descrlbeA <br />as a 25 year flood. <br />Alining Plan - Exhibit D <br />What is the current estimate of the life of the miner Lhiat Is the <br />best quantllativc estimate of the annual anount of shale, bone and <br />~~, coal processing refuse that you can provide? <br />Please proveAe a complete rationale, design plan and unAernrounA m <br />map of the new proposed ventllatlon shaft. Any pertinent eorrespon- <br />dcncc with !iSilA and USSS should also be includrd. <br />The use of the unidentified stockpile should be discussed in this <br />sectlon if It is to reomin to your mining operation. <br />•r ;_, Reclamation Plan - Exhlblt E} <br />.- A reclamation plan or the ventllatlon shaft and face up, the access <br />road, topsoil borrovm pit and coal storage area should be provided. <br />A specific plan which includes topsoiling should he presented for <br />the refuse pile. DurTnn the site Inspection I noteA fenced eotton- <br />• wood 8rees. About half of them have survived should I assume that <br />the cottonwood seedlings are in addition to these plantings? <br />The proposed seed mixture is deficient in that no nitrogen fixing <br />species Is provided. We recommmnd Htlk Vetbh, DTrds Foot Tree Foll <br />or perhaps yellow swectclover. A combination of two of the above <br />amounting to 1 lb/acre PLS would also be deslreable for critical <br />areas (i.e. poor soil or climatic rondtbcbons) SCS recom enAs 40 <br />seeds/sq foot if sends arc Arllled. Your mixture will provided <br />2~ seodslsq.f0ot On arras to be revegetnteA without sufficient top- <br />soil (G-12") the proposed sending rate should be doubled. <br />Reclamation Plan Maw Exhlblt F <br />s map may have to be changed to reflect o different permit area. <br />_2_ <br />,_',,:: <br />,,;,., <br />;:... <br />II .. LL~ ~ '. ... .. <br />a <br />