Laserfiche WebLink
,~ <br />~ M ~ ~~~ ~~~~~~~~~~~~~ ~~~ <br />999 <br />`~~- _ , ~ _ <br />,, <br />;~ <br />Colorado Yampa Coal Company P O. Box 774288. Steamboat Springs. CO 80477 • Telephone (303) 8793800 <br />Mr. Bob Liddle <br />Colorado Mined Land <br />Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />June 29, 1984 <br />RECEIVED <br />JUL 0 51984 <br />MI Cola Dept of N~itorallResources~N <br />RE: Stabilization Plan for Rills and Gullies at Energy Mine X13; <br />C-03-81 <br />Dear Mr. Liddle: <br />In response to your request for a stabilization plan for rills and <br />gullies on Mine 3, I conducted a field survey of the area and have <br />developed a plan that will alleviate the erosion problems on the area. <br />Most of the gullies on the site have been caused by water breaching <br />either an irrigation ditch or a diversion ditch. All ditches on the site <br />are scheduled for maintenance this July. The maintenance operations are <br />to be performed so that all material cleaned out of the ditch will be <br />placed on the downhill side to act as a berm. Also, where the breach is <br />located at a bend in the ditch, the area will be armored with rock from <br />the surrounding site. Existing gullies in the topsoiled areas of Mine 3 <br />will be corrected by August 15, 1984. The existing gullies will be <br />evaluated to determine if they need to be filled in or whether gully <br />plugs could be utilized to begin reparation of the sites. <br />Additionally, diversion ditches will be placed above the Homestead <br />ditch to help divert water across the slopes and away from ditch areas <br />succeptible to breaching. Water spreading ditches will also be utilized <br />below the Homestead ditch in the event a breach occurs. The additional <br />diversion ditch work will be conducted after the topsoiling activities <br />scheduled for the Fall of 1984 are completed. <br />The CYCC will continue to maintain all diversion and irrigation <br />ditches for sediment control on the Mine 3 area. <br />The plan outlined above will alleviate the erosional problems on the <br />site, with all operations to be completed by the Fall of 1984. <br />