My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11277
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:38 PM
Creation date
11/19/2007 2:19:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Application Correspondence
Doc Date
2/9/1984
Doc Name
MEEKER AREA MINES PERMIT REVIEW
From
MLRD
To
MIKE SAVAGE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o~ ~o<~ <br />.<F' \'~y <br />~T a .lL i°!# Q <br />v, O <br />r X876 ~ <br />Richard D Lamm <br />Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTO N, Director <br />February 9, 1984 <br />T0: <br />FROM: <br />SUBJECT: <br />Bondin <br />Mike Savage <br />Dan Mathews <br />~~~%~j <br />Meeker Area Mines ~ermit Review <br />III IIIIIIIIIIIIIIII <br />1. Reclamation cost estimates for the Northern No. 1 (FF-Seam) Mine are <br />provided on Page M-12 of Volume VII. A total cost of $146,250.00 is <br />projected, but detailed engineering estimates and cost justifications are <br />not provided. On page M-12a of Volume VII, it is stated that detailed <br />estimates will be provided upon resolution of such issues as final <br />topography, topsoil depth and final drainage design. <br />2. On Page 19 of Volume XII (Adequacy Response) a total reclamation cost <br />estimate for the Northern No. 1 of $267,000.00 is provided, based on the <br />interim reclamation plan approval. Topsoilin9 costs were estimated at <br />$5.00 per cubic yard and backfilling costs were estimated at $1.57/yd3. <br />Exhibits M-1 and t4-4 of Volume VII are referenced as providing volume and <br />slope information. These exhibits are not in the application. <br />Obviously, the information provided to date does not meet the requirements <br />of Rules 2.05.4(2)(b). Detailed engineering calculations based on equipment <br />productivities, material volumes, job factors and rental rates~`rsequired. <br />Apparently reclamation cross sections for Nothern No. 1 which would provide <br />a basis for cost calculations, were withdrawn prior to resubmittal in <br />October, 1982. <br />Rienau No. 2 Mine Increased Production Modification <br />1. Updated operation and reclamation plans for the Rienau No. 2 are contained <br />in a Volume which Northern intended to submit in April, 1981. The Volume is <br />not on file at the Division, and there is no record of its receipt. Comments <br />in the adequacy letter of June, 1981, indicate that the Volume was never <br />reviewed by the Division. <br />OSM records indicate that one copy of the Volume of concern was submitted to <br />their office in April, 1981. It is the public display copy and thus, is not <br />available for our review. I have asked Hank Coufos to submit three copies. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.