Laserfiche WebLink
_, ~. n. <br />XXI. Bonding <br />2. The affected acres at Pits 1, 2, 3, 5 and 6 are as follows: <br />Pit 1 14.3 acres <br />Pit 2 27.6 acres ~~~ Q^ ~j~~~,oo%az,~ <br />Pit 3 30.1 acres ~ /fps 7 ~ <br />~y~~II <br />Pit 5 22.3 acres ~ C ~'1ie~ <br /> <br />Pit <br />6 <br />10.6 <br />acres , <br />/~~,~ <br />~ <br /> /yam.'- <br />`°'--"i <br />All these pits except Pit 6 have been regraded, topsoiled, and seeded. <br />When calculating bond required, it appears that the Division should <br />use some number less than bonding for an area that is disturbed and /~ <br />not yet reclaimed. The Rockcastle Company believes that no bond <br />should be required for Pits 1, 2, 3 and 5. 4 4,3 ~i <br />Pit 6 has been approximately 60-70~ filled in with overburden. <br />About 2,000 cubic yards of overburden and 4,000 cubic yards of <br />topsoil remain to be spread at Pit 6. <br />Using numbers generated above and in Table 2, p. IV-4 of the permit <br />application, the following values could be used for bonding at Pit 6. <br />Backfilling and grading <br />', Topsoil redistribution <br />Seeding costs <br />Mulching costs <br />Fertilizing costs <br />Maintenance <br /> . f ~(- <br />2,000 yards @ $0:~#fyd~ <br />4,000 yards @ $0.~~~ <br />10.6 acres @ $325/ac <br />10.6 acres @ $143/ac <br />10.6 acres @ $100/ac <br />10.6 acres @ $50/ac <br />Ite~d <br />-$-939: B6-' <br />~~ <br />$3445.00 <br />$1516.00 <br />$1060.00 <br />R 530.00 <br />'~,avr <br />Total costs for reclamation at Pit 6 ~;3~3-00-• <br />